>> HZMB - > Home > Method Statement
Method Statement
Method Statement

IMT foundation trench dredging


Initial dredging with grab vessel: grab dredger with grab capacity of 20m3 and above is used in dredging works.


Accurate dredging: “Jinxion” vessel equipped with performance of horizontal dredging at fixed depth is used in dredging.


Sedimentation removal: special purpose sedimentation removing vessel “ Jielong” to be reformed is proposed to be used in this dredging works.

  • Preview:Prefabrication of steel cylinder (2011-05-12)

  • ICP:05060342-2 | Set Index | Favorite | Web Master
    HongKong-Zhuhai-Macao Bridge www.cccchzmb.com
    Web Support:CCCC Ltd